Guwahati: A proposed mega dam in Arunachal Pradesh has triggered strong protests among sections of the indigenous Adi community, even before construction has been approved. The controversy centres on the 11,200-megawatt Siang Upper Multipurpose Project (SUMP), which the government considers strategically important for India’s water security and flood management.
Union Home Minister Amit Shah arrived in Arunachal Pradesh for a two-day review visit amid growing opposition to the project. He acknowledged the concerns of residents and assured them that the government was willing to engage in dialogue, while maintaining that the project was important for national interests and the development of the state.
The project, being undertaken by the National Hydroelectric Power Corporation (NHPC), covers parts of Siang, Upper Siang and East Siang districts. Once developed, it is expected to become India’s largest hydropower and water-storage facility.
Unlike conventional run-of-the-river projects, SUMP is being planned primarily as a strategic reservoir capable of storing water and moderating floods. The project received National Project status from the Union Cabinet in February 2008.
One of the major reasons behind the renewed push for the project is China’s construction of a 60,000 MW hydropower facility in Tibet, near the Indian border. The Yarlung Tsangpo river flows from Tibet into Arunachal Pradesh as the Siang before entering Assam as the Brahmaputra.
The Arunachal Pradesh government has expressed concerns about possible changes in water flows due to upstream developments. It believes a storage reservoir could help India prepare for sudden increases in river discharge and water shortages during dry months.
However, the project remains at the pre-feasibility report stage. Current activities are limited to technical, environmental and geological investigations to determine whether such a large reservoir is viable in the earthquake-prone region.
Chief Minister Pema Khandu has clarified that construction has not been approved and that any future decision would involve mandatory public hearings and legal procedures concerning compensation and rehabilitation.
Why Are Local Communities Protesting?
Sections of the Adi community fear that the proposed reservoir could submerge ancestral villages, agricultural land, paddy fields and orange orchards. Organisations including the Siang Indigenous Farmers’ Forum and Adi Baane Kebang United have opposed even the preliminary surveys.
Tensions increased following the preventive detention of four activists in October under the Arunachal Pradesh Unlawful Activities (Prevention) Act, 2014. A subsequent 12-hour shutdown witnessed violence, including the burning of an NHPC office and police vehicles in Pasighat. Central security personnel were deployed across the affected districts.
Protest leaders have maintained that dialogue cannot begin until security forces are withdrawn and cases registered against protesters are addressed.
Meanwhile, former Union minister and Pasighat West MLA Ninong Ering has argued that completing the technical study is necessary to understand the project’s actual impact, including the areas that could face submergence.
The central disagreement remains whether the proposed reservoir can protect India’s water interests without permanently affecting the homes, livelihoods, environment and cultural heritage of communities living along the Siang Valley.







