Team Goemkarponn
PANAJI: Traffic on National Highway-66 in Goa will be diverted onto temporary extended lanes along a 400-metre stretch from November 28 to December 10 to facilitate the ongoing construction of a temporary and permanent toll plaza at Km 476.500.
The diversion has been notified by the Executive Engineer of Works Division VII (NH), Public Works Department, Goa, through a notification dated November 27, 2026.
The toll plaza project is being undertaken under the Annual Plan 2024-25 on the Engineering, Procurement and Construction (EPC) mode. The temporary traffic arrangements have been introduced to ensure the smooth and speedy completion of the work without hindrance.
According to the notification issued by Executive Engineer Gajanan R. Desai, traffic will be diverted onto temporary extended lanes on both sides of the highway for a short stretch of 400 metres.
The contracting agency has been directed to install barricades, blinkers and adequate lighting arrangements, particularly during night hours, to ensure the safety of road users. Signboards displaying the diversion period in Konkani, English and Hindi will also be installed at the diversion points.
The agency has further been instructed to provide rumble strips and road marking studs to regulate vehicle speeds and strictly follow the approved traffic diversion plan and instructions issued by the concerned authorities.
Motorists using this stretch of NH-66 have been advised to exercise caution and follow the traffic signs and directions during the diversion period.







