Team Goemkarponn
BAMBOLIM: A joint inspection was conducted by officials of various government departments at Bambolim to assess traffic arrangements and plan a road diversion ahead of the lifting and erection of a foot overbridge (FOB).
The inspection focused on evaluating site conditions and identifying the measures required to ensure the smooth execution of the bridge installation work while minimising inconvenience to commuters.
Officials from the concerned departments discussed traffic management, public safety and inter-departmental coordination during the erection process. The proposed diversion is intended to facilitate the movement of vehicles and ensure the work is carried out in an organised manner.
The foot overbridge erection is expected to require coordinated traffic arrangements in the area, with commuters likely to be guided through the designated diversion during the operation.
Further details regarding the diversion route, traffic restrictions and the schedule for the bridge erection are expected to be announced by the concerned authorities.







