Goemkarponn desk
PONDA: Underground Cabling in four constituency of Ponda Taluka will be taken up at a cost of Rs 160 crore with Rs 40 crore being spent in each constituency at Ponda, Marcaim, Priol and Shiroda, said Power Minister Sudin Dhavlikar.
Power Minister said the main target is to generate revenue of Rs 600 crore to undertake development work in the power sector including undeground cabling.
The today foundation stone for underground cabling at Ponda commenced at hands of Power Minister Sudin Dhavlikar. from Booadbag Talule in Marcaim constituency at a cost of around Rs 13 crore wherein work of improvement of 11 kV High Tension Electrical network of 11 kV Undir and 11 kV Durbhat feeder will be taken with underground cabling, this work would benefit 8000 houses from parts of four Panchayat including Kavlem, Bandora, Wadi Talavalim and Durbhat Agapur.
Power Minister said the main target is to generate revenue and after he take over charge as power Minister he managed to generate revenue of Rs 180 Crore in four months due to which revenues of the Power department increased by Rs 36 per cent the first time.
Trending
- Ignored Cheteshwar Pujara Sends Big Message To BCCI Ahead of England Tests
- AB De Villiers Backs Rohit Sharma: ‘Why Would He Retire? Can Go Down As One Of The Best ODI Captains’
- Toll On National Highways Collected In Perpetuity; No Need To Audit For Reducing Booths, Ministry Tells RS
- NASA-SpaceX Postpone Mission To Bring Back Stranded Astronauts Sunita Williams, Butch Wilmore
- “What’s The Need To Play Politics”: Shashi Tharoor On Bihar Mayor’s Holi Statement
- Delhi’s New BJP Government Starts Withdrawing Cases Against Lt Governor: Sources
- “Don’t Need Hindu Certification…”: Mamata Banerjee vs BJP In Bengal Assembly
- India, Mauritius Sign Eight Key Agreements to Boost Bilateral Cooperation