Goemkarponn desk
PANAJI: The Supreme Court has ordered a stay on the construction of a bridge over the Tiracol River and issued notices to the concerned parties on a petition filed by an NGO.
The Apex court said, “We make it clear that in the meanwhile, the construction of the Tiracol River bridge shall not commence.”
In 2015, the Goa Foundation filed an application for a stay of work on the Rs.77 crore “signature bridge” across the Tiracol river before the National Green Tribunal on grounds of being approved in violation of the CRZ notification. The NGT ordered a stay on construction.
The petitioner argued that Querim Beach had been declared as CRZ I because of its outstanding natural beauty and sand dunes, which would not allow the construction of a bridge of the kind envisaged as CRZ I beaches are No-Development Zones. The bridge alignment also deviated from the RP 2021 alignment for a proposed bridge.
The petitioners also drew the attention of the NGT that the bridge was not a public facility since Tiracol had only 50 families, and it was difficult to conceive of a government spending Rs.77 crores for a bridge that would satisfy their requirement of being connected to the mainland, across the river.
Petitioners provided evidence from the records of the GSIDC that the bridge was intended to benefit a private golf course resort to be located in Tiracol village. In fact, the bridge design was generated by the golf course promoters from Singapore to suit the golf course. The resort putting up the golf course had argued that the “signature bridge” would provide a spectacular entry to their golf resort.
In January 2020, the NGT (Delhi) dismissed the application of the Foundation without hearing the Foundation. After a Bombay High Court order, the matter was placed before the NGT, again dismissing the application without hearing the petitioner on merits.
Comment